The purchase price of an industrial blade alone does not express its cost of use. To compare recycling alternatives, relate the cost of the kit to the tons accepted and the operations necessary during its service life.
Define what the comparison includes
Record purchase, transportation, sharpening and services attributable to the game. Add change time when it can be measured consistently. Separate blade costs from other breakdowns; Attributing an entire parry to the edge can distort the result.
Compare equivalent conditions
Two sets should be evaluated with similar materials, contamination, flow rate and configuration. Note declared steel, geometry, fit and sharpening limits. A clean batch and an abrasive batch do not allow us to draw a direct conclusion about the quality of the spare parts.
Calculate without losing output quality
Divide the defined accumulated cost by the useful tons processed during the period. As an arithmetic example, 1,200 euros between 300 tons is equivalent to 4 euros per ton; It is not a guaranteed trading performance. Also record rejection, fines and equipment loading. A part with a lower apparent cost may be inconvenient if it worsens the product or requires more interventions.

Frequently asked question
Is the harder blade always cheaper?
No. Hardness must be analyzed together with toughness, processed material, geometry and observed behavior.
Technical documentation
BÖHLER: K110 steel. Consult your equipment’s specific documentation for maintenance procedures.
Consult blades and industrial spare parts
Check out our spare parts for industrial machinery and the options sharpening and repair. Send us brand, model, reference, measurements and photographs to study the piece and prepare your budget.